Welcome to the Oakland Alameda Access Project page. This page is being redesigned to make information more accessible. Please check back regularly for updates.
New: Open House Informational Events! The Alameda County Transportation Commission will host four in-person OAAP informational open houses, details shown below. Information and materials provided at these open house meetings will be the same. This is a chance to learn about the project that is anticipated to begin construction early Fall 2025. A virtual presentation will be held May 14, 2025: bit.ly/OAAPVirtualPresentation
(Preregistration is not necessary.)
Open House #1 |
Open House #2 |
Open House #3 |
Open House #4 |
Virtual Presentation |
---|---|---|---|---|
April 23, 2025 5-6:30pm | April 24, 2025 6-7:30pm | April 29, 2025 4:30-6:00pm | April 30, 2025 5-6:30pm | May 14, 2025 5-6:30pm |
BLOC15 Venue 252 2nd St, Oakland, CA 94607 |
Alameda Chamber of Commerce 2215-A S Shore Center, Alameda, CA 94501 |
Oakland Asian Cultural Center 388 9th St Ste 290, Oakland, CA 94607 |
College of Alameda (Student Lounge) 555 Ralph Appezzato Memorial Pkwy, Alameda, CA 94501 |
Registration Link: bit.ly/OAAPVirtualPresentation |
If you need language or other accessibility accommodations, please email the project team at OAAPCommunications@alamedactc.org at least 72 hours before the meeting you plan to attend.
Construction Timeline

Construction timeline may change depending on baseline schedule of selected contractor. Caltrans will lead public outreach for construction timeline updates, activities and other critical details once the contractor is selected. Updates can be followed at OaklandAlamedaAccessProject.com.
Project Details
The I-880 Oakland Alameda Access Project (formerly called the I-880 Broadway-Jackson Project) proposes to improve connectivity between I-880, I-980 and the cities of Oakland and Alameda.
Alameda CTC, the project sponsor, and Caltrans, the lead for California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) requirements, are working in partnership with the cities of Oakland and Alameda to plan, identify and analyze potential freeway access and local roadway improvements between I-880, I-980 and the Posey/Webster Tubes connecting the two cities. The project is being coordinated with multiple corridor planning efforts and local and regional developments including but not limited to the Downtown Oakland Specific Plan to make sure that any multi-modal improvements identified will not conflict with future plans within the corridor.
These proposed improvements will provide direct travel routes for motorists traveling to or from the freeway to their desired location. The project will reduce freeway-bound traffic within heavily populated pedestrian neighborhoods like Chinatown and construct safe and accessible bicycle and pedestrian facilities that will provide improved connectivity for all modes between Downtown Oakland, Chinatown, the Jack London District and Alameda.
The Final Environmental Document (FED) for the Oakland Alameda Access Project has been approved. The full FED including appendices is available on the Resources tab.
Sign up for the mailing list here
Project presentations are available in English, Chinese, Spanish, and Vietnamese and can be found on the Resources tab. Project fact sheets are also available in English, Chinese, Spanish, and Vietnamese and are available on the Fact Sheets tab.
For total project cost and phase information, see the project Fact Sheets tab.
New: Open House Informational Events! The Alameda County Transportation Commission will host four in-person OAAP informational open houses, details shown below. Information and materials provided at these open house meetings will be the same. This is a chance to learn about the project that is anticipated to begin construction early Fall 2025. A virtual presentation will be held May 14, 2025: bit.ly/OAAPVirtualPresentation
(Preregistration is not necessary.)
Sign up for the mailing list here
MAPS
DOCUMENTS
-
- Notice of Availability
- Frequently Asked Questions
- Public Outreach Summary Report
- Final Environmental Document (FED)
- Draft Environmental Document (DED)
- Appendices
- DED Summary
- Appendices
ARCHIVE
Sign Up to receive project updates.